HalfMoon Education Inc. Knowledge Gets You There

Back to Search

Presenter: Floyd Ostrowski, PMP

Seminar Date:

Seminar Location: Online

Register Now * Coordinator Registration Not Available.

  1. Construction Scheduling

    Click the links below to view information about each part in this series or to register for a specific one.

Agenda:

Fine-Tuning and Changing the Construction Schedule
Thursday, May 28, 2020, 1:30 - 3:30 PM CDT

   Resource allocation and resource leveling

   Materials management

   Scheduling and cost control

   Working with floats and with lags

   Handling delays

   Crashing the schedule



Webinar Instructions

Each webinar session earns continuing education credit and can be registered for individually. All attendees must log-on through their own email – attendees may not watch together if they wish to earn continuing education credit. HalfMoon Education Inc. must be able to prove attendance if either the attendee or HalfMoon Education Inc. is audited.


Certificates of completion will be provided for each webinar attended and will be sent via email in PDF form about five business days after the conclusion of the series.


Webinars are presented via GoToWebinar, an easy-to-use application that can be run on most systems and tablets. Instructions and login information will be provided in an email sent close to the date of the webinar. It is highly recommended that you download, install and test the application before the webinar begins by clicking on the link in the email.

GoToWebinar App requirements: 
Windows 7 - 10 or Mac OSX 10.9 (Mavericks) - 10.14 (Mojave)


Web Browser:
The two most recent version of the following browsers:
Google Chrome, Mozilla Firefox, Apple Safari, Microsoft Edge
Internet Explorer v11 (or later) with Flash enabled


Internet connection:
 Minimum of 1Mbps       Hardware: 2GB RAM or more


For more information, visit the Support section at www.gotowebinar.com.



Credit Information:

Who Should Attend

  • Architects
  • Engineers

Architects - AIA
     2.0 CE Hours 
     2.0 LU|Elective

Engineers
     2.0 PDHs


Continuing Education Credit Information

See each course listing for the type and amount of each continuing education credit available. Individual courses for engineers and architects are not subject to pre-approval. HalfMoon Education does not apply for landscape courses in FL, NC, and NJ or land surveyor courses in FL, KS, NJ, TN and TX, unless expressly stated.

HalfMoon Education Certifying Entities

American Institute of Architects Continuing Education System (No. J885)

International Code Council (No. 1232)

Landscape Architect Continuing Education System

American Institute of Certified Planners (APA)

Boards of Engineering: Florida (No. 0004647), Indiana (License No. CE21700059), Maryland, New Jersey (Approval No. 24GP00000700), North Carolina (No. S-0130), and North Dakota.

Course-by-Course Providers: Association of State Floodplain Managers

HalfMoon Education is deemed a New York-approved continuing education provider for engineers and architects via its registration with the American Institute of Architects Continuing Education System (Regulations of the Commissioner §68.14(i)(2) and §69.6(i)(2)). NY landscape architects: §79-1.5(i)(2)

Speakers:

Floyd Ostrowski, PMP

Assistant Professor of Practice, University of Tennessee

Mr. Ostrowski is an assistant professor of practice for the Department of Industrial and Systems Engineering and the University of Tennessee in Knoxville. He has a 40-year progressive track record in advanced manufacturing concepts beginning as a machinist apprentice and culminating in a Chief Operating Officer position with multi-plant, multi-state, international operations experience. He has strong lean manufacturing skills. His work and experience has attained results that have radically streamlined and improved supply chain processes, achieving high levels of profitability, responsiveness, inventory turns and customer satisfaction. This was accomplished through driving the implementations of JIT (pull replenishment), TQM, and employee empowerment (Kaizen Blitz events and cross-functional teams). Mr. Ostrowski earned his B.A. degree in Business Administration from Antioch University in 1990 and his M.S. degree in Industrial Technology, Manufacturing Concentration, from East Carolina University in 2002. He also received executive education from Harvard Business School in operations management and finance.

Tuition Costs:

Standard Tuition: $100.00
Online Tuition (pre-registration): $100.00

Each registration includes one copy of a manual prepared by the seminar speakers.